-------------------------------- ----------------------------------------------------------------------------------
-----
GBase 8s 备份与恢复指南
南大通用数据技术股份有限公司 - 105 -
当 BAR_PERFORMANCE 设置为 2 或 3 时,活动报告使用微秒时间戳记(如以下示例
所示):
图: ON-Bar 活动日志中的样本处理速率(以微秒计)。
2009-06-03 16:34:04 15272 15270 /usr/gbasedbt/bin/onbar_d complete,
returning 0 (0x00)
2009-06-03 16:45:11.608424 17085 17083 /usr/gbasedbt/bin/onbar_d -r -w
2009-06-03 16:46:07.926097 17085 17083 Successfully connected to Storage
Manager.
2009-06-03 16:46:08.590675 17085 17083 Begin salvage for log 311.
2009-06-03 16:48:07.817487 17085 17083 Completed salvage of logical log 311.
2009-06-03 16:48:08.790782 17085 17083 Begin salvage for log 312.
2009-06-03 16:48:10.129534 17085 17083 Completed salvage of logical log 312.
2009-06-03 17:06:00.836390 17085 17083 Successfully connected to Storage
Manager.
...
2009-06-03 17:07:26.357521 17085 17083 Completed cold level 0 restore
datadbs07.
2009-06-03 17:07:28.268562 17085 17083 Begin cold level 0 restore datadbs08
(Storage Manager copy ID: 28122 0).
2009-06-03 17:07:29.378405 17085 17083 Completed cold level 0 restore
datadbs08.